OUR PROJECTS


We provide a variety of services delivered by qualified and experienced engineers, for residential & commercial projects.

Project Details


We were tasked with supply and installing commercial kitchen equipment. This included stainless steel pot washes, hand wash sinks, taps, and water heaters. We carried out pre and post water sampling and disinfection of pipework.


SENEDD | CARDIFF BAY


Arguably the most iconic building in Wales, a privilege to work in this magnificent building.


NORWEGIAN CHURCH, CARDIFF BAY


In 2010 the Norwegian Church one of Wales most iconic buildings began its refurbishment. We were there to provide mechanical support.


Project Details


Supply and installation of sanitaryware, column radiators, gas fired boiler and associated pipework. 

CENTRE 7


A large commercial office space located at Cardiff Gate. A large refurbishment covering all M&E, we were tasked to provide mechanical support.


SWANSEA UNIVERSITY


A very interesting project in the Marine Biology department. We played a small part in modernising their working environment ready for their latest research and projects.


Project Details


Supply and installation of sanitaryware including DOC M packs, hot water heaters, trace heating and associated pipework.


Project Details


Supply and installation of several multipoint water heaters, lab sinks and air lines.


Project Details


At St Fagans Cricket club we renewed the club's gas fired Andrews hot water calorifier. This served multiple hot water outlets including, the large shower area. With limited space to operate in, we managed to safely de-commission the existing calorifier, install new and recommission in less than 48hrs from receiving the order. A club at the heart of its community. A fantastic local project to be involved with.


ST FAGANS CRICKET CLUB

BRISTOL AIRPORT

Project Details


At Bristol Airport we had the pleasure of supplying & installing the sanitaryware in the staff WC’s in Arrivals. For security reasons we took part in multiple security checks to gain clearances to work on site. The new look was complete with IPS panelling, back to wall pans, chrome flush plates, DocM pack and urinals with a concealed sparge pipe system. All pipework was chlorinated upon completion. The project lasted approximately twelve weeks.

ROLLS ROYCE

Project Details


At Rolls Royce we installed high spec Vitra sanitaryware. The refurbishment included both male & female toilet and shower areas. Where possible all pipework and drainage was to be concealed behind IPS panelling, where exposed we would use chrome pipe and fittings. All wash basins were protected using TMV’S. We were also tasked with supplying and installing the porcelain floor and wall tiles